EPIC B: CI + Test Reliability (Week 1-2) #2

Closed
opened 2026-03-03 23:20:25 +00:00 by Mark · 1 comment
Owner

Metadata

  • Type: epic
  • Priority: high
  • Area: quality

Goal

Establish quality gates that prevent regressions and ensure repeatable releases.

Scope

  • CI checks for lint, typecheck, build
  • Deterministic test data and environment setup
  • Critical path Playwright coverage

Child Tickets

  • #8 ND-004: Add CI quality gates for lint, typecheck, and build
  • #9 ND-005: Stabilize deterministic test data and seed flow
  • #10 ND-006: Expand Playwright critical-path coverage

Exit Criteria

  • PR checks block regressions
  • Tests are reproducible locally and in CI
  • Core auth/paywall/CRUD/export flows are covered
## Metadata - Type: epic - Priority: high - Area: quality ## Goal Establish quality gates that prevent regressions and ensure repeatable releases. ## Scope - CI checks for lint, typecheck, build - Deterministic test data and environment setup - Critical path Playwright coverage ## Child Tickets - [ ] #8 ND-004: Add CI quality gates for lint, typecheck, and build - [ ] #9 ND-005: Stabilize deterministic test data and seed flow - [ ] #10 ND-006: Expand Playwright critical-path coverage ## Exit Criteria - PR checks block regressions - Tests are reproducible locally and in CI - Core auth/paywall/CRUD/export flows are covered
Author
Owner

This issue has been decomposed into the following sub-issues:

# Title Phase Scope
#37 EPIC B: CI + Test Reliability (Week 1-2) — Phase 1: Metadata - Type: epic - Priority: high - Area: quality
#38 EPIC B: CI + Test Reliability (Week 1-2) — Phase 2: Goal Establish quality gates that prevent regressions and ensure repeatable releases.
#39 EPIC B: CI + Test Reliability (Week 1-2) — Phase 3: Scope - CI checks for lint, typecheck, build - Deterministic test data and environment
#40 EPIC B: CI + Test Reliability (Week 1-2) — Phase 4: Child Ti - [ ] #8 ND-004: Add CI quality gates for lint, typecheck, and build - [ ] #9 ND
#41 EPIC B: CI + Test Reliability (Week 1-2) — Phase 5: Exit Cri - PR checks block regressions - Tests are reproducible locally and in CI - Core

Each sub-issue has been labeled with needs-triage and will be evaluated by the triage pipeline before queue routing.

This issue has been decomposed into the following sub-issues: | # | Title | Phase Scope | |---|-------|-------------| | #37 | EPIC B: CI + Test Reliability (Week 1-2) — Phase 1: Metadata | - Type: epic - Priority: high - Area: quality | | #38 | EPIC B: CI + Test Reliability (Week 1-2) — Phase 2: Goal | Establish quality gates that prevent regressions and ensure repeatable releases. | | #39 | EPIC B: CI + Test Reliability (Week 1-2) — Phase 3: Scope | - CI checks for lint, typecheck, build - Deterministic test data and environment | | #40 | EPIC B: CI + Test Reliability (Week 1-2) — Phase 4: Child Ti | - [ ] #8 ND-004: Add CI quality gates for lint, typecheck, and build - [ ] #9 ND | | #41 | EPIC B: CI + Test Reliability (Week 1-2) — Phase 5: Exit Cri | - PR checks block regressions - Tests are reproducible locally and in CI - Core | Each sub-issue has been labeled with `needs-triage` and will be evaluated by the triage pipeline before queue routing.
Mark closed this issue 2026-05-28 01:03:08 +00:00
Sign in to join this conversation.
No description provided.