Break down #16 into implementable work units — Phase 1: Test infrastructure — install vitest, @testing-library/react, jsdom, @testing-library/jest-dom, @testing-library/user-event. Add vitest.config.ts, test setup file, and test:run script to packa… #380

Closed
opened 2026-06-09 06:33:17 +00:00 by Mark · 1 comment
Owner

Phase 1: Test infrastructure — install vitest, @testing-library/react, jsdom, @testing-library/jest-dom, @testing-library/user-event. Add vitest.config.ts, test setup file, and test:run script to package.json. Verify with a trivial smoke test.

Files: package.json, vitest.config.ts, src/test/setup.ts, src/test/smoke.test.ts


Decomposed from llm_quota#17


Decomposed from llm_quota#19


Decomposed from llm_quota#379

## Phase 1: Test infrastructure — install vitest, @testing-library/react, jsdom, @testing-library/jest-dom, @testing-library/user-event. Add vitest.config.ts, test setup file, and test:run script to package.json. Verify with a trivial smoke test. **Files:** package.json, vitest.config.ts, src/test/setup.ts, src/test/smoke.test.ts --- _Decomposed from [llm_quota#17](https://forgejo.tail018ac4.ts.net/Mark/llm_quota/issues/17)_ --- _Decomposed from [llm_quota#19](https://forgejo.tail018ac4.ts.net/Mark/llm_quota/issues/19)_ --- _Decomposed from [llm_quota#379](https://forgejo.tail018ac4.ts.net/Mark/llm_quota/issues/379)_
Author
Owner

This issue has been decomposed into the following sub-issues:

# Title Phase Scope
#381 Break down #16 into implementable work units — Phase 1: Test Files: package.json, vitest.config.ts, src/test/setup.ts, src/test/smoke.tes

Each sub-issue has been labeled with needs-triage and will be evaluated by the triage pipeline before queue routing.

This issue has been decomposed into the following sub-issues: | # | Title | Phase Scope | |---|-------|-------------| | #381 | Break down #16 into implementable work units — Phase 1: Test | **Files:** package.json, vitest.config.ts, src/test/setup.ts, src/test/smoke.tes | Each sub-issue has been labeled with `needs-triage` and will be evaluated by the triage pipeline before queue routing.
Mark closed this issue 2026-06-09 06:39:18 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Mark/llm_quota#380
No description provided.